Insulation is now on site. 280mm thick, it goes outside new/existing solid masonry walls.
28
2009
27
2009
Solar roof complete
Solar electric and hot water panels on the roof are all now complete!
(more…)
21
2009
First ten solar PV panels
First ten photovoltaic panels (the ones that will generate electricity from the sun) fitted today – despite some heavy showers! (more…)
21
2009
19
2009
Nesting boxes for swifts
The last two bird nesting boxes for swifts built in and curving roof completed.
14
2009
Two bird boxes built in today
Two bird boxes built in today for black redstarts and sparrows – sociable creatures.
14
2009
Bat box
Carpenters have made bat box in the curving wall, facing north so sunshine won’t wake up bats in the day.
13
2009
Gently curved wall in progress
Gently curved wall is being beautifully constructed above roof level by John the carpenter
05
2009
Lid to cantilevered dormer window is now on
Lid to cantilevered dormer window is now on, framing amazing view to city centre.
28
2009
Clay walls protected from rain
Load-bearing 3-storey clay block walls well wrapped up against the April showers.