- Local sweet chesnut laths going onto soffit of the projecting dormer window. #
Oct
30
2009
30
2009
Twitter Weekly Updates for 2009-10-30
Oct
23
2009
23
2009
Twitter Weekly Updates for 2009-10-23
- The bathroom door is fitted; it glides away into a secret pocket in the wall. #
- Stuart is fixing the last blocks of 280mm Neopor insulation, now frameless glass is all in. BBC want to film. #
- Taps being fitted now. In the kitchen we have a special spray tap with harvested rainwater for scrubbing carrots etc. #
- Template taken for kitchen worktops today, Bottle Alley is 100% recycled English glass, greeny white with bubbles… #
Oct
16
2009
16
2009
Twitter Weekly Updates for 2009-10-16
- Grouting our tiled basin splashbacks – using small smooth grey/white pebbles instead of tiles. #
- Eddie is refitting the maple stairs, open tread with a beautifully crisp 6mm routed anti-slip groove. #
- All remaining frameless glass fitted at last – delay as it broke before reaching us three times. No fault of our wonderful builders! #
- Sweet chestnut laths outer skin now racing away over the frameless glass we were waiting for. #
- Bath is fitted, grey water waste goes to a reclaimed oak barrel for watering the garden. #
Oct
09
2009
09
2009
Twitter Weekly Updates for 2009-10-09
- COME & VISIT the completed house on Sat 14 November 10.00 – 16.00! #
Oct
02
2009
02
2009
Twitter Weekly Updates for 2009-10-02
- Our PV installation is now connected to the grid and generating 100% renewable solar electricity! #